How Much Does a Bathroom Renovation Cost in Gloucester in 2025?

How Much Does a Bathroom Renovation Cost in Gloucester in 2025? (Realistic Price Guide)

In Gloucester in 2025, a typical bathroom renovation usually costs:

  • £4,000–£6,000 for a simple refresh (keeping everything in the same place)
  • £6,000–£9,000 for a full standard renovation (new suite, tiling, lighting, etc.)
  • £9,000+ for a high-end or complex bathroom (large format tiles, niches, underfloor heating, premium fixtures)

At CK Building, most of our bathroom projects in and around Gloucester, Cheltenham and Stroud fall between £6,000 and £9,000, depending on size, specification and how much we need to change the layout or pipework.

Modern bathroom renovation in Gloucester by CK Building

What Affects the Cost of a Bathroom Renovation in Gloucester?

Several key factors will push your bathroom renovation cost up or down:

1. Size of the Bathroom

  • Small cloakrooms or ensuites generally cost less overall but have a higher cost per m².
  • Larger family bathrooms cost more in total, but the cost per m² is often a bit lower.

2. Specification of Fixtures and Fittings

  • Budget-friendly suites from mainstream suppliers will keep costs down.
  • Premium brands, designer taps, concealed cisterns and bespoke furniture will raise the price.
  • Tiles can vary massively – from £20/m² to £80+/m².
Modern bathroom renovation in Gloucester by CK Building

3. Tiling and Wall Finishes

  • Fully tiled walls and floors cost more than partial tiling or panels.
  • Large format tiles and patterned layouts take longer to install.
  • Extras like tile niches and feature walls add both labour and material cost.

4. Layout Changes and Plumbing Work

  • Keeping the layout the same (toilet, shower, bath and basin in roughly the same place) is cheaper.
  • Moving drainage, altering pipework or changing from a bath to a walk-in shower adds extra cost.

5. Condition of the Existing Room

  • Old bathrooms sometimes hide issues like rotten floors, old plumbing or poor electrics.
  • Correcting these is essential for a safe, long‑lasting finish and can add to the budget.

6. Electrical Work and Lighting

  • Upgraded lighting (spots, LED mirrors, under‑cabinet lighting) and safe bathroom electrics are important.
  • Extractor fans are often needed to meet modern ventilation standards.

Typical Bathroom Renovation Price Ranges (Gloucester Area)

Below is a realistic guide based on the projects we regularly see in and around Gloucester, Cheltenham, Stroud, Quedgeley and the surrounding villages.

1. Cosmetic Refresh – From Around £2,000–£4,000

A cosmetic or "light" refresh might include:

  • Replacing taps and shower
  • Re-silicone and re-grout where needed
  • Painting walls and ceiling
  • Possibly changing a small amount of tiling or flooring

This is suitable if your bathroom layout and main fixtures are in good condition but just look tired.

2. Standard Full Bathroom Renovation – Around £4,000–£7,000

This is the most common type of project we see:

  • Strip out the existing bathroom
  • New bath or shower, basin, and toilet
  • New tiling around wet areas and possibly the floor
  • New flooring and decorating
  • Updated lighting and extractor fan

Costs sit towards the lower end if you keep the same layout, choose mid-range suites and tiles, and have no major hidden issues behind walls or under floors.

3. High-End or Complex Bathroom – £7,000–£12,000+

A high-spec or complex bathroom might include:

  • Large walk-in shower with glass screens
  • Built-in storage and bespoke joinery
  • Large format or premium tiles
  • Underfloor heating
  • Feature lighting and alcoves/niches
  • Moving plumbing and drainage

These projects are more involved but can completely transform how you use the space and how your home feels.

CK Building team bathroom installation Gloucester

How Long Does a Bathroom Renovation Take?

Most bathroom renovations in Gloucester take approximately:

  • 7–10 working days for a standard full renovation
  • 10–15 working days for more complex or high-end bathrooms

This usually includes:

  1. Strip-out and preparation (old suite out, tiles removed, walls and floors prepared)
  2. First fix plumbing and electrics (pipework and wiring where needed)
  3. Tiling and flooring
  4. Second fix (new suite installed, towel rails, shower screens, etc.)
  5. Finishing touches (silicone, painting, final clean)

We plan work carefully to keep the disruption as low as possible and keep you updated each day on progress.

Bathroom Renovation Examples Around Gloucester

Here's how these price ranges look in real life:

Example 1: Family Bathroom in Gloucester

Location: Gloucester
Scope: Full strip-out and refit, layout kept similar

Work:

  • New bath with shower over
  • New basin and toilet
  • Tiled bath/shower area and floor
  • New lighting and extractor

Typical cost: Around £6,000–£7,000

Bathroom before renovation - Gloucester

Before – Dated bathroom in Gloucester

Bathroom after renovation - Gloucester by CK Building

After – Full renovation by CK Building

Example 2: Walk‑In Shower in Longlevens

Location: Longlevens
Scope: Change from bath to walk-in shower

Work:

  • Remove bath and tiling
  • Install low-level shower tray and glass screen
  • Waterproofing and full-height tiling
  • New vanity unit and heated towel rail

Typical cost: Around £7,000–£8,500, depending on tiles and fixtures

Example 3: Compact Ensuite in Quedgeley

Location: Quedgeley
Scope: Small ensuite refresh

Work:

  • New shower enclosure
  • New toilet and basin
  • Partial tiling and new flooring

Typical cost: Around £4,000–£5,500

Do I Need Planning Permission for a New Bathroom?

In most cases, you don't need planning permission for an internal bathroom renovation in Gloucester.

However, you may need Building Regulations approval if:

At CK Building, we can advise you on what's needed and make sure your project is completed to the correct standards.

How to Keep Your Bathroom Renovation on Budget

Here are some practical tips to control costs without cutting corners:

  1. Decide your must-haves vs nice-to-haves
    Prioritise good quality fixtures and waterproofing over flashy extras.
  2. Keep the layout similar if possible
    Moving drains and soil pipes is one of the biggest extra costs.
  3. Choose tiles wisely
    A mid-range tile, installed well, usually looks better than a very expensive tile installed badly.
  4. Allow a small contingency
    Especially in older properties, set aside 10–15% for any surprises once we open up walls or floors.
  5. Use a reputable local bathroom fitter
    Good planning, clear communication and experienced trades reduce the risk of delays and costly mistakes.
CK Building team bathroom installation Gloucester

Why Choose CK Building for Your Bathroom Renovation in Gloucester?

We're a local building company working across Gloucester, Cheltenham, Stroud, Quedgeley, Churchdown and nearby villages, with hands-on experience fitting bathrooms in all types of homes.

When you choose CK Building, you get:

We're happy to visit, talk through ideas and provide a no-obligation quotation.

Get a Personal Bathroom Renovation Quote

Every bathroom and every home is a bit different, so the best way to get an accurate figure is to arrange a quick visit.

If you're in or around Gloucester, Cheltenham or Stroud and you're planning a new bathroom, contact CK Building today for a free, no-obligation quote.

Get Your Free Quote

Frequently Asked Questions About Bathroom Renovations in Gloucester

How much does a small bathroom renovation cost in Gloucester?
A small bathroom or ensuite renovation in Gloucester typically costs between £4,000 and £6,000. This usually includes a new suite (toilet, basin, shower), tiling, flooring, and updated lighting. The final cost depends on the quality of fixtures and whether you keep the existing layout.
How long does it take to renovate a bathroom in Gloucester?
Most bathroom renovations take 7–10 working days for a standard project, and 10–15 days for more complex or high-end bathrooms. This includes strip-out, plumbing and electrical work, tiling, installation of the new suite, and finishing touches.
Do I need Building Regulations approval for a bathroom renovation?
You usually don't need planning permission for a bathroom renovation, but you may need Building Regulations approval if you're creating a new bathroom, making structural changes, or significantly altering drainage or ventilation. We can advise you on what's required for your specific project.
What's the most expensive part of a bathroom renovation?
The most expensive elements are usually tiling (both materials and labour), moving plumbing or drainage, and high-end fixtures and fittings. Keeping the layout similar and choosing mid-range tiles can help control costs significantly.
Can you fit a walk-in shower instead of a bath?
Yes, we regularly convert baths to walk-in showers in Gloucester homes. This typically costs £7,000–£8,500 depending on the size, tiling, and fixtures. Walk-in showers are popular for improving accessibility and creating a more modern, spacious feel.
Which areas around Gloucester do you cover?
We cover Gloucester, Cheltenham, Stroud, Quedgeley, Churchdown, Longlevens, Hucclecote, Brockworth, Tuffley and surrounding villages. If you're unsure whether we cover your area, just get in touch and we'll let you know.